Assembly & Maintenance

Fitting
The rubber panels can be installed on concrete, asphalt, cement, sand, gravel or earth surfaces.
- The surface on which the rubber tiles are mounted must be uniform, without bumps or major holes.
- It is mandatory that the surface be compacted and pressed as well as possible.
- To ensure water drainage in the case of the concrete layer, ensure a drainage slope of 1-2%.
- Installation is done by simply placing them in the desired configuration.
- The positioning of the first tiles requires special attention, since the arrangement of the successive elements and the entire work depends on them.
- Lateral blocking at the field boundary is mandatory.
Maintenance
We recommend washing the rubber pavers with a water hose to remove dust and debris. When using a pressure washer, the pneumatic gun must be kept at a minimum distance of 30 cm so as not to damage the rubber tiles.
Also, they can be cleaned with a soft or mature brush. In the case of stains, use a damp cloth and a little foamy water to remove them.
